Two overnight closures coming to Highway 1 at Tank Hill as work on new bridge progresses
LYTTON, B.C. — There will be another two overnight closures on the Trans-Canada Highway at Tank Hill this month as crews work to build a new bridge over the existing rail line.
The Ministry of Transportation and Transit says Highway 1 between Lytton and Spences Bridge will be closed in both directions from 10:00 p.m. Thursday (Aug. 7) to 9:00 a.m. Friday (Aug. 8).
The highway will also be closed from 10:00 p.m. next Tuesday (Aug. 12) to 9:00 a.m. Wednesday (Aug. 13) to allow for the placement of deck concrete on the new overpass structure.
“Checkpoints with traffic-management personnel will be set up at the Highway 12 and Highway 8 intersections to provide travellers with information about alternative routes during the closures,” a statement from the Ministry said.


